            PCA “ТETOVO” – Tetova is a company which is established by the council of Municipality of Tetova, from where it derives the commitments of the company to the citizens of this  Municipality or offering these services: water supplying, municipality hiene, public clearing Managing the bazaars, managing the cemetery, organization and maintaining of parks and greenery . In this project we will be focused on finding a modus which through the project we will succeed to rise the number covering with water meters  (100% covering about 25000) in the city.  PCA Tetovo on the annual level produces 10 milion m3 water. For maintaining the water meters which will be mounted, PCA Tetovo will make controls for correctness through the department for Water techniques Lab  (sandblaster)

  1. Covering with water meters in city of Tetova
  • Total number of users  –  about  25000 water meters
  • Total covering of users with water meters – 6000 water meter

     The main aim is to prepare a project from which there will come out total covering with water meters which will lover the loss of registered water in the city

    For complete realization of this project it is needed to be installed 19000 water meters with module for remote reading and by two ventilate and holenders also a closed car for transportation with load from 850 till 1100 kilograms.

untitled342

   Specification of the water meter

j.jpg

  More Jet humid type of water meter

gigiu1.png

  • More jet humid type
  • 360° rotated cap
  • Showing of 5 indexes for m3 and 4 arrows for liter
  • Irrevocable ventilate
  • Counted content till R160
  • The box is created from brass
  •  Water temperature till 50°C
  • Output for pulse reading , M-bus, output for the radio frequency 868 Mhz

Specification

untitled

Dimensions

gigiu1.png

Curve of mistakes

gigiu1.png

Lost of the Pressures

gigiu1.png

Time of Realization of the project

   For complete realization of the project there will be needed period of 48 months respectively  4 years for complete realization where are included time of mounting and the purchase of water meters with module with remote reading with ventilate and holonders.

  • This project will allow in a continuously registering of used water which PCA is distributing to all the users in the city from the city.

 Reasons

  • Decreasing of the unregistered distribution of the water,
  • Planned usage ,
  • Decreased lost ,
  • Planning and predicting of the amount of water at the suppliers.

Plan project

            PCA “Тетово” – Tetova  is a company which is established by the council of Municipality of Tetova, from where it derives the commitments of the company to the citizens of this  Municipality or offering these services: water supplying, municipality hiene, public clearing Managing the bazaars, managing the cemetery, organization and maintaining of parks and greenery. . In this project we will be focused on finding a modus which through the project we will succeed to rise the number covering with water meters of tip B of ¾ and ½ inches with total amount of water meters with module for remote reading from which 19000 already mounted are 6000 water meters in most of the locations in the city so we will cover about 25000 registered users of water in the city and other places where PCA is supplying.

  • Objectives of the project

PCA Tetovo generate about  10.000.000 m3 water per year .  Registered are only 3.000.000 m3 water per year. Through complete realization of the project based on the statistic details which PCA TETOVO has there will be twice less used water which are paying all physical and legal subjects for the service and production and distribution respectively from 3.000.000m3  дtill know registered used water it will be raised till 6.000.000 m3  water on annual level.

 Working operations

    For realization of this project there are needed 4 years . during this period there will be mounted about 19000 water meters with module for remote reading and by two holonders and ventilate in each one.

а. Ordering of water meters with module for remote reading and holonders

б. Instalation of water meters with module on reading and holonders

   Ordering of water meters with module for remote reading and holonders

  In this working operation there will be realized orderings of 19000 (10000 from donations and 9000 from own means and resources) water meters with module for remote reading and 38000 ventilate and holonders  (each water meter by two holonders and ventilate)

   Installation of water meters with module on reading and holonders

  According to the possibilities and unpredicted operative segments PCA Tetova can realize about 400 installation of the water meters with module for remote reading and holonders for period of one month i.e. about 19000 for  48 months  (4 years )

  • For further realization of this project with faster and more effective and more economic reaching the aim we need 10000 water meter with module for remote reading, ventilate and holonders from donations and 9000 water meters with module for remote reading, ventilate and holonders from our own means and resources’.

 Needed amount in realization of the project

*Needed amount :

Untitled.png

 Importance

  • Efficiency,
  • Increase control of consumptions of the water,
  • Decrease of loses,
  • Practicality.

Well kipping

For maintaining of the further continuance of the completed work operations which are predicted on this project will be engaged working power, tool and mechanization which will be under PCA TETOVA ownership.

Archive support

For all the working operation predicted on the project are PCA TETOVA – TETOVA has all needed documentation which will be used for archive needs.